Corporate

TRANSFORMER ASSEMBLY AND DISASSEMBLY WORKS

The assembly and disassembly works for the distribution transformer, power transformer and auto transformers are performed by our exper t staff, regardless of their brands.

TRANSFORMER MAINTENANCE AND TESTING PROCEDURES

For transformers to operate for long periods of time without incurring any issues, they have toundergo periodic maintenance as least once a year. With our mobile service vehicles, we are conducting the in situ maintenance, testing and service procedures of oiled/dry power and distribution transformers with the help of our exper t and experienced staff.

About Us.

As ANA ANKARA , we are operating with our experienced staff both domestically and abroad , in fields such as engineerings services, low voltage - medium voltage and high voltage swichgears , powe plants , shoping malls , iron / stel plants etc .

Contact

Kent Koop. Mah. 1862 Sk. Yeni Başkentliler Sit. E 2 Blok No: 22 Yenimahalle - Batıkent - ANKARA / TÜRKİYE Tel: +90 312 252 00 63 Fax: +90 312 252 00 64 Gsm: +90 534 271 79 32

Our Services

GAS ANALYSIS

Oil treatment or oil replacement is decided depending on the oil analysis result. These procedures are performed on-site with our mobile device

PROTECTION AND CONTROL RELAY TESTS

Relays are components that control higher currents and voltages. Relays can also perform switching without being affected by different frequencies and wawes and can protect and control different types of electrical circuits and circuit components.

VOLTAGE TRANSFORMER

Voltage transformers reduce the primary voltage on the circuit they are connected to, feed the equipment connected to the secondary terminals using this voltage and insulate them from high voltage. Classes are divided into oiled and dry types. Maintenance, testing and installaation of these transformers are performed by our company with the assistance of qualified personnel.

CURRENT TRANSFORMER

Current transformer is designed to create a secondary current that is proportional to the primary current. Current transformers are defined according to their conversion ratios, accuracy classes and power ratings. Accuracy class varies depending on the ares of use for the transformer.

DISCONNECTOR

Tests and Maintenance Performed on the Disconnectors

CIRCUIT BREAKER

Maintenance and testing of the HV open swich and MV clesed swich breakers are performed on- site by our exper t staff.

TRANSFORMER ASSEMBLY AND DISASSEMBLY WORKS

The assembly and disassembly works for the distribution transformer, power transformer and auto transformers are performed by our exper t staff, regardless of their brands

Testing Procedures Performed For Transformers

Transformers are subjected to a series of tests to ensure they are working within the rated and standard values specified on the labels. Per forming such tests periodically and regularly is impor tant for the safety and healthy operation of the plant.

TRANSFORMER MAINTENANCE AND TESTING PROCEDURES

For transformers to operate for long periods of time without incurring any issues, they have toundergo periodic maintenance as least once a year. With our mobile service vehicles, we are conducting the in situ maintenance, testing and service procedures of oiled/dry power and distribution transformers with the help of our exper t and experienced staff.

Announcements

  • Furthermore, even though there are all kinds of announcements, there are basic structural standards for writing an announcement letter. Following are some hints and tips to help craft a memorable announcement letter.

    Sample announcement 2
  • Whether you're announcing a budget surplus, job opening, or change in policy, your announcement letter should be to the point, clearly written,

    Sample announcement 1